1、溝渠開挖
1. Trench excavation
混凝土路面和瀝青路面的開挖應(yīng)使用切割機(jī)進(jìn)行切割。
The excavation of concrete pavement and asphalt pavement shall be cut by cutting machine.
管道溝應(yīng)按設(shè)計(jì)規(guī)定的平面位置和標(biāo)高開挖。采用人工開挖且無地下水時(shí),槽底預(yù)留值應(yīng)為0.05~0.10m;管道安裝前應(yīng)人工清底設(shè)計(jì)標(biāo)高。
The pipe trench shall be excavated according to the plane position and elevation specified in the design. When manual excavation is adopted and there is no groundwater, the reserved value at the bottom of the trench shall be 0.05~0.10m; Before pipe installation, the bottom shall be manually cleaned to the design elevation.
溝底的寬度和工作尺寸應(yīng)根據(jù)現(xiàn)場實(shí)際情況和鋪設(shè)管道的方法確定。
The width and working size of the trench bottom shall be determined according to the actual situation on site and the method of laying pipes.
局部超挖部分應(yīng)回填壓實(shí)。溝底無地下水時(shí),超挖0.15m以內(nèi),可用原土回填;如果超挖在0.15以上,可以使用石灰土。當(dāng)溝底有地下水或大量積水時(shí),宜采用級配碎石或天然砂回填標(biāo)高。超挖部分應(yīng)回填后壓實(shí),壓實(shí)度應(yīng)接近原地基天然土的壓實(shí)度。
Local over excavation shall be backfilled and compacted. If there is no underground water at the bottom of the ditch, the original soil can be used for backfilling within 0.15m of over excavation; If the overbreak is more than 0.15, lime soil can be used. When there is underground water or a large amount of ponding at the bottom of the ditch, graded crushed stone or natural sand should be used for backfilling to the elevation. The over excavated part shall be backfilled and compacted, and the compaction degree shall be close to that of the natural soil of the original foundation.
濕陷性黃土區(qū)不宜在雨季施工,或施工時(shí)應(yīng)有效溝內(nèi)積水。開挖時(shí),溝底應(yīng)預(yù)留0.03~0.06m厚的土層進(jìn)行壓實(shí)處理。
The construction in the collapsible loess area should not be carried out in the rainy season, or the ponding in the ditch should be effectively removed during construction. During excavation, 0.03~0.06m thick soil layer shall be reserved at the bottom of the ditch for compaction.
當(dāng)溝底有廢棄構(gòu)筑物、硬石、木材、垃圾等雜物時(shí),必須,并鋪設(shè)一層厚度不小于0.15m的沙土或素土、平整、壓實(shí)和設(shè)計(jì)用于高程。
When there are waste structures, hard stones, wood, garbage and other sundries at the bottom of the ditch, they must be removed, and a layer of sand or plain soil with a thickness of not less than 0.15m must be paved, leveled, compacted and designed for elevation.
軟土地基和特殊腐蝕性土按設(shè)計(jì)要求處理。
Soft soil foundation and special corrosive soil shall be treated according to design requirements.
管道警示帶
2.回填土壤
2. backfill soil
(1)不得使用凍土、垃圾、木材和軟質(zhì)材料進(jìn)行回填。管道兩側(cè)及管頂以上0.5m內(nèi)回填土不得含有碎石、磚塊等雜物,不得回填石灰土。離管頂0.5m以上的回填土中石子不得超過10%,直徑不得大于0.1m,并應(yīng)分布均勻。
(1) Frozen soil, garbage, wood and soft materials shall not be used for backfilling. The backfill at both sides of the pipeline and within 0.5m above the pipe top shall not contain debris, bricks and other debris, and shall not be backfilled with lime soil. The stones in the backfill soil 0.5m above the pipe top shall not exceed 10%, the diameter shall not be greater than 0.1M, and shall be evenly distributed.
(2)溝槽支撐應(yīng)在管道兩側(cè)及管頂以上0.5m處回填壓實(shí),在保證的情況下拆除,縫隙應(yīng)采用細(xì)砂填平。
(2) The trench support shall be backfilled and compacted at both sides of the pipe and 0.5m above the pipe top. It shall be removed under the condition of safety. The gap shall be filled with fine sand.
(3)回填溝渠時(shí),應(yīng)先回填管底懸空部分,再回填管道兩側(cè)。
(3) When backfilling ditches, the suspended part at the bottom of the pipe shall be backfilled first, and then both sides of the pipe shall be backfilled.
(4)回填土應(yīng)分層壓實(shí)。每層厚度應(yīng)為0.2~0.3m。管道兩側(cè)及管頂以上0.5m以內(nèi)的回填土必須人工壓實(shí),離管頂0.5m以上的回填土必須人工壓實(shí)??刹捎眯⌒蜋C(jī)械壓實(shí),每層虛鋪的厚度應(yīng)為0.25~0.4m。
(4) Backfill shall be compacted in layers. The thickness of each layer shall be 0.2~0.3m. The backfill on both sides of the pipeline and within 0.5m above the pipe top must be compacted manually, and the backfill above 0.5m from the pipe top must be compacted manually. Small machinery can be used for compaction, and the thickness of each layer of virtual paving shall be 0.25~0.4m.
(5)回填土壓實(shí)后,應(yīng)逐層檢查密實(shí)度,并做好回填記錄。
(5) After the backfill is compacted, the compactness shall be checked layer by layer and the backfill records shall be made.
3.警示帶鋪設(shè)
3. warning tape laying
沿埋地燃?xì)夤艿缿?yīng)連續(xù)鋪設(shè)警示帶。在鋪設(shè)警示膠帶前,應(yīng)將鋪設(shè)面壓實(shí)并平放在管道頂部。
Warning tapes shall be continuously laid along buried gas pipelines. Before laying the warning tape, the laying surface shall be compacted and laid flat on the top of the pipe.
管道警示帶應(yīng)采用黃色聚乙烯等不易分解的材料制作,并印有明顯、牢固的警示語,字體不小于100*100mm。
The pipeline warning tape shall be made of yellow polyethylene and other materials that are not easy to decompose, and shall be printed with obvious and firm warning words, with the font not less than 100*100mm.
以上就是問題解答的相關(guān)內(nèi)容了,希望能夠幫助到大家,如對這一問題還存在任何疑問,都?xì)g迎關(guān)注我們網(wǎng)站http://m.zjzuche.com.cn并咨詢我們的工作人員,將竭誠為您服務(wù)。
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://m.zjzuche.com.cn And consult our staff, will serve you wholeheartedly.

相關(guān)產(chǎn)品 / Related products

  • 地釘

    地釘

  • 地釘

    地釘

  • 警示樁

    警示樁

  • 警示樁

    警示樁

截屏,微信識別二維碼

人妻少妇精品一区二区三区| 777色米奇影院| 日韩喷吹| 天堂网AV无码一区二区| 高跟鞋射精| 你懂的的网| 欧美日韩一级免费在线| 久久99热这里只有精品| 无码人妻一区二区三区手机视频| 久久久丁香视频| 丰满人妻一区二区三| 日韩在线观看免费| 久久久久久国精品色费色费s| 国产AV剧情网站| 黄色视频 你的| 最新轻轻色在线视频| 亚洲视频无码小视频| 久精品一区二区| 亚洲精品国产乱码| 中文字幕在线观看日本| 免费A级毛片无码遮挡| 13Av在线视频| 91男人激情天堂| 77777sex| 精品免费二区三区三区高中清不卡| 手交刺激在线观看国产| 欧美日韩国产中文字幕在线| 曰批全过程免费视频在线观看网站| 日韩本无码高清| 一区二区三区四区狠狠爽| 人妻在线百度网盘资源| 老熟妇的黑森林| 一级毛片大学生九九精品视频| 亚洲av美女网址| 国产又滑又嫩又白| 国产精品一区二区手机| 久久无码va一区二区三区| 亚洲av永久无码精品天堂久久 | 欧美日韩国产中文一区| 久久天堂亚洲| av换脸在线观看|